top of page

1980–1988

Middle East, Kuwait

With FHWA Kuwait Division Office
Was assigned and served Distinct Dual Roles as follows:

 

As (GS-14) FHWA Highway Construction Engineer reporting directly to FHWA Division Administrator to provide advise and assistance on all Roads & Infrastructures Projects in the MPW Local Projects Section (From 15 to18 Projects at any time, with a value in the range of US $180 Million.)

As MPW Engineer’s Representative reporting directly to MPW Chief Engineer, Roads Administration; with duties for Project Management and Administration on Major Programs and Design-Build Projects including:

Steel Flyover
Bridges Program

14 Locations

US $ 70 Million

Bubiyan Turnkey

Contract project for connecting the mainland of Kuwait with Bubiyan Island and developing the first island roadways.

 

US $ 75 Million

Fintas Superblock

Infrastructure construction to develop 10 Sq. Km. of Desert into

a model City neighborhood with irrigated landscaped roads, bridges, and all utilities networks.

1

2

3

bottom of page